
Description
The hostel at the former border crossing Hodonín / Holíče was reconstructed in 2012. The reconstruction included newly equipped public restroom with urinals, closets or token-operated shower automat.
Range of project
- Customized wall-mounted wash trough
- Stainless steel urinal AUP 03
- Stainless steel closet with a reservoir and plastic seat
- Accessories
- Token-operated shower automat ZAS 3.TV
- Surface shower unit AUS 3.P
- Floor channels
Place of realization
StarTrack hostel, former border crossing Hodonín / Holíče
Investor
–
Building company
–